What we do

In some cases traditional methods are still the best. Timber headings are constructed by hand and have the ability to divert past any unknown obstructions.

We have experience constructing shafts up to 30m in diameter and to depths of 35m, in locations varying from residential streets to operational sites.

TPMD offer partial and complete tunnel and sewer rehabilitation, using various strengthening options focusing on trenchless technology methods.

With our extensive range of modernised pipejacking equipment, we’re able to offer the most appropriate machine for every scheme.

Microtunnelling is an efficient and environmentally-friendly alternative to open-trench construction and we operate a range of microtunnelling TBMs.

We’re an industry specialist when it comes to installing GRP liners of any shape and size and we have some of the finest installers in the country.
Need our help for your project?
Meet our team

Matt Durbin

Andrew Lambe

Keiron Lonergan

Andreas Becherer
They say
Testimonials
What’s new
Latest news

The multi-million pound upgrade of Thanet’s sewers has been shortlisted for two prestigious industry awards.

February saw the country battered by storms. In Thanet, the TPMD site teams took a break from the tools to help those struggling with the high winds.

TPMD has made its life-saving AED defibrillator available to the public in case of an emergency.


